The Challenge
The institute needed additional, reliable power capacity to serve its buildings and equipment, requiring a properly rated substation.

Supply, installation and commissioning of a 500 KVA substation at Rangpur Polytechnic Institute, Rangpur.
Case Study
The institute needed additional, reliable power capacity to serve its buildings and equipment, requiring a properly rated substation.
We supplied and installed a 500 KVA substation with its transformer, switchgear and cabling, then tested and commissioned it to bring the new capacity safely into service.
The institute now has a commissioned 500 KVA substation delivering reliable power across its facilities, with headroom for its electrical load.
1 photo
More Work

Supply and installation of nightscaping and exterior lighting across the BUP residential campus, delivered under the campus development project.
View details
Supply and installation of a solar-powered irrigation system providing reliable, off-grid water pumping for agricultural use.
View details
Supply, installation and commissioning of a complete fire detection system at the DHL warehouse in Tongi.
View details